Series 732 Transition for Ductile Iron Size PVC/HDPE Submittal
Transition Fitting for Ductile Iron Size PVC/HDPE
The transition fitting is constructed out of PVC material, ductile iron, and high density polyethylene (HDPE) 3408 pipe. The PVC and HDPE materials are joined together by hydraulically pressing the HDPE pipe into the ductile iron coupling. The coupling portion of the transition fitting is machined with our multi-level barb system that provides a leak-free radial compressed joint. The HDPE and PVC portions of the transition fitting are cut to a specific length and are pressed into the coupling.
Quality Assurance
The transition fitting shall be manufactured by Poly-Cam, Inc. Poly-Cam, Inc. shall provide quality assurance with regards to proper installation, compatibility, performance, and acceptance.
System Performance
The transition fitting is designed to handle the pressure rating of the HDPE pipe with a 2:1 safety factor at 73.40 degrees Fahrenheit with a minimum 50 year design life.
Materials
Ductile Iron coupling: The coupling is manufactured out of ductile iron.
PVC C900: PVC C900 conforms to ASTM D1784 and is available in sizes 4″ through 12” in various wall thicknesses.
High Density Polyethylene: The transition fitting is constructed with a 3408 HDPE pipe (cell class 345454c) classified according to ASTM D3350.
Installation
HDPE pipe end
Install transition fitting to comply with the pipe manufacturer’s recommended procedures. All field welds shall be accomplished per Plastic Pipe Institute’s welding procedure for butt fusion or electrofusion.
PVC coupling
Install the PVC coupling to comply with the pipe manufacturer’s recommended procedures for solvent cement.
- A medium-bodied, medium set multi-purpose cement designed for use on PVC, CPVC and ABS pipe and fittings.
- For potable water and pressure pipe.
- Flows freely and provides a thick layer of cement on the pipe and loose-fitting joints.
- Apply at temperatures 40°F to 100°F.
- Meets ASTM D-2564
Warranty
The warranty period is one year after the date of substantial completion of installation.